Wednesday, 17 July 2013

Begining of our project

15/7/2013


Today was the first day for us to do our own research. Our group is going to study about the plants diversity along the stream. Since the water content of the soil near the stream will be higher, it would reduce the oxygen content inside the soil. Therefore, it would cause easy damage to the root of the plant. Therefore, we are looking for the plants that can grow well near the river and its adaptation. In the afternoon, we went out to do the survey. At first, we are going to collect some soil sample from the site. Unfortunately, it suddently rain and it would directly affect our sample. Therefore, we can only take some plant sample back to our room for identification. Today is a tough hiking date.

No comments:

Post a Comment